FPGA Market

Obsolete device

EPM9560 replacement options

The Intel EPM9560 has been discontinued by the manufacturer. There are two ways forward, and for most people reading this the first one is the answer: keep the design and source the part. Changing device means a board revision, so it is only worth it if you are redesigning anyway.

1. Keep the design — source the EPM9560

Discontinued parts are still traded. We hold 14 orderable EPM9560 parts — send the exact code and quantity and we'll come back with stock and pricing, including date-code and traceability requirements.

Request a quote
Part numberPackagePinsSpeedTemperature
EPM9560ARC304-10FARC30430410Commercial
EPM9560ABC356-10BC35635610Commercial
EPM9560ARC208-10NRC20820810Commercial
EPM9560ARC208-10RC20820810Commercial
EPM9560RC208-15RC20820815Commercial
EPM9560RC208-20RC20820820Commercial
EPM9560ARC240-10RC24024010Commercial
EPM9560ARC240-10NRC24024010Commercial
EPM9560RC240-15RC24024015Commercial
EPM9560RC240-20RC24024020Commercial
EPM9560ARI208-10RI20820810Industrial
EPM9560RI208-20RI20820820Industrial
EPM9560ARI240-10RI24024010Industrial
EPM9560RI240-20RI24024020Industrial

A different package or speed grade of the same device is the closest thing to a like-for-like change: the silicon is the same, so only the footprint or timing differs. It still needs checking against your board.

What to check before changing device

  • Footprint and pinout

    Ball count, pitch and pin assignment all differ between families. A new device means a new layout.

  • I/O voltages and banks

    Supported I/O standards, bank voltages and the number of banks change between generations.

  • Core and I/O supplies

    Newer devices usually run a lower core voltage and need a different power tree.

  • Configuration

    Flash type, configuration mode and boot timing are family-specific.

  • Tools and IP

    The design has to be rebuilt in the current toolchain, and IP cores may need replacing or re-licensing.

  • Temperature and lifetime

    Check the grade you need exists, and how long the new family is expected to stay in production.

Where a design cannot be revised — certified equipment, long-life industrial and defence builds — sourcing the original is normally the cheaper route, even at obsolete pricing.

Guides and comparisons