FPGA Market

Obsolete device

A3PN030 replacement options

The Microchip A3PN030 has been discontinued by the manufacturer. There are two ways forward, and for most people reading this the first one is the answer: keep the design and source the part. Changing device means a board revision, so it is only worth it if you are redesigning anyway.

1. Keep the design — source the A3PN030

Discontinued parts are still traded. We hold 16 orderable A3PN030 parts — send the exact code and quantity and we'll come back with stock and pricing, including date-code and traceability requirements.

Request a quote
Part numberPackagePinsSpeedTemperature
A3PN030-Z1QNG48IQNG4848Z1Industrial
A3PN030-Z1QNG48QNG4848Z1
A3PN030-Z2QNG48IQNG4848Z2Industrial
A3PN030-Z2QNG48QNG4848Z2
A3PN030-Z2QNG68IQNG6868Z2Industrial
A3PN030-Z2QNG68QNG6868Z2
A3PN030-Z1VQ100IVQ100100Z1Industrial
A3PN030-Z1VQ100VQ100100Z1
A3PN030-Z2VQ100IVQ100100Z2Industrial
A3PN030-Z2VQ100VQ100100Z2
A3PN030-Z1VQG100IVQG100100Z1Industrial
A3PN030-Z1VQG100VQG100100Z1
A3PN030-Z2VQG100IVQG100100Z2Industrial
A3PN030-Z2VQG100VQG100100Z2
A3PN030-ZVQ100IZVQ100100Industrial
A3PN030-ZVQ100ZVQ100100

A different package or speed grade of the same device is the closest thing to a like-for-like change: the silicon is the same, so only the footprint or timing differs. It still needs checking against your board.

What to check before changing device

  • Footprint and pinout

    Ball count, pitch and pin assignment all differ between families. A new device means a new layout.

  • I/O voltages and banks

    Supported I/O standards, bank voltages and the number of banks change between generations.

  • Core and I/O supplies

    Newer devices usually run a lower core voltage and need a different power tree.

  • Configuration

    Flash type, configuration mode and boot timing are family-specific.

  • Tools and IP

    The design has to be rebuilt in the current toolchain, and IP cores may need replacing or re-licensing.

  • Temperature and lifetime

    Check the grade you need exists, and how long the new family is expected to stay in production.

Where a design cannot be revised — certified equipment, long-life industrial and defence builds — sourcing the original is normally the cheaper route, even at obsolete pricing.

Guides and comparisons